01823 297042 Get a quote

Flat to pitched

Can You Change a Flat Roof to a Pitched Roof?

The short answer

Yes, a flat roof can be changed to a pitched roof, but it is a rebuild rather than a repair. The new roof needs its own timber frame, Building Regulations approval and, because it alters the outline of the house, a word with the council's planning team before anything is priced. The walls underneath have to be surveyed first.

Swapping a flat deck for a sloping roof gives a house a new shape and a new set of rules. Here is what the change involves.

What the change involves on site

A pitched roof is not laid over a flat one like a lid. It is a new frame. Rafters slope up from a wall plate, a timber bedded along the head of each wall, and they meet at the ridge. Ties or collars stop them pushing the walls outwards. Battens then cross the rafters, and the tiles or slates hang from the battens.

Can my existing walls carry a pitched roof?

That is the first thing a survey answers. A flat extension roof may sit on walls built for a lighter load, with a lintel or beam that was never meant to take the thrust of a sloping frame. We look at the walls, the joists and the top courses of brickwork, and you see pictures of what is there.

The old flat covering and its insulation usually come off before the new frame goes up, and ceiling joists below can often stay if they are sound. A rooflight or parapet changes the detail, because the new slope has to meet them. The order matters too: drawings, approval, scaffold, frame, then a weathertight covering.

Building Regulations for new roof work

Building a new roof frame counts as structural work, which brings it under the Building Regulations and needs approval. That means an application to your building control body: Somerset Building Control for an address in the Somerset Council area (0300 303 7790), or a registered building control approver.

What will building control look at?

The frame comes first. Rafter sizes, the ties, the fixings at the wall plate and the load passing into the walls all belong on the drawings. For Full Plans, Somerset Building Control says to expect a reply within 10 working days and a decision in about 5 weeks, so build that wait into your plans.

Insulation is the second test. Approved Document L (2021 edition) Table 4.2 gives 0.15 W/(m²·K) as the roof U-value to reach, which is the figure for replacement roofs. The 2026 edition takes effect on 24 March 2027, so your designer works from whichever edition applies on the day of the application. A covering that weighs 15 per cent more than the old one brings approval into play on that ground too. The loft space also needs ventilating, to BS 5250, and a completion certificate belongs in your house papers once the work is signed off.

Planning: why the council comes first

Turning a flat roof into a pitched one changes the outside of the house. Under the Town and Country Planning Act, works that leave the external appearance of the building materially unaltered are not development, and a new roof shape does not fall into that group.

Does Class C permitted development cover it?

Class C of the permitted development order covers other alterations to the roof of a house, which is why swapping one covering for another is usually simple. It does not apply where the alteration would protrude more than 0.15 metres beyond the plane of the slope of the original roof. A new ridge raised over a flat deck is a different thing from swapping tiles, so the planning answer starts with the planning officers at Somerset Council, or at Exmoor National Park Authority if the house stands inside the Park.

Take extra care in a conservation area. On a listed house, listed building consent is a further step whenever the work alters its character. If you want a dormer on the new slope, expect to apply when the house lies in a conservation area, inside Exmoor, or within the Quantock, Blackdown or Mendip Hills National Landscapes. Flats and maisonettes sit outside these house rights altogether, so ask the council first and draw afterwards.

Keeping the flat roof, and what comes next

A pitched roof is not always the better answer. A flat roof in sound order can be recovered with a new membrane for far less disruption, and our page on flat roof planning permission covers what that route needs. The reasons flat roofs earn a poor name, and where they do well, are in are flat roofs a bad idea.

What are the downsides of going pitched?

More roof means more covering, more timber and more height, and the cost and upkeep side is set out in the disadvantages of a pitched roof. A single-storey extension has a further detail to solve: how the new slope meets the main house wall, which is where lead flashing earns its place.

The practical start is a survey of the old roof and its walls. We record what the structure can take, you see photos of it, and we explain what a pitched roof would need on that house. A written price follows the survey for whichever roof you choose. The rest of our sloping-roof work is on the pitched roofing page.

More on flat to pitched

Can I convert a flat roof without Building Regulations approval?

No. Putting up a fresh roof frame is structural work that needs approval whatever the planning position, and planning permission is a separate question. Your building control body wants to see the structural design and the insulation before work starts, and it inspects the frame while it goes up.

Will a pitched roof give me extra loft space?

It creates a roof void, but not every void is usable. Headroom depends on the pitch and the span, and making it a room is a loft conversion, which brings separate rules on stairs, escape and insulation. A plain pitched roof over a flat extension usually gives a cold void that needs ventilation, not a room.

The full picture: Pitched roofing in Taunton · More short answers

Get your free roof quote

Tell us about the roof and we will arrange a survey.

01823 297042

10-year workmanship guarantee, in writing.

Call Get a free quote