01823 297042 Get a quote

Roofers in Somerton

A Grade I church, a 1673 market cross and lias walls

Somerton stands on a Lower Lias ridge between the Yeo and Cary valleys, with 117 listed buildings within 900 metres of the centre. Our survey precedes any figure.

Get a free quoteCall 01823 297042

Market cross, church nave and Methodist chapel

Rear of a brick house with a tiled roof and chimney seen from the garden

The 1673 market cross

An open octagonal structure of lias whose octagonal roof carries an embattled parapet and a ball finial.

Lead-covered bay window roof on a brick house

St Michael and All Angels

Listed Grade I since 17 April 1959, with a low-pitched nave roof dating from about 1510.

Street of red brick and stone cottages with clay tile roofs and chimneys

Somerton Methodist Church

Grade II listed in 1959; if it is in worship use, repairs follow the Methodist Church's own consent system.

Street map of Somerton with Long Sutton, Compton Dundon, Huish Episcopi, Butleigh marked around it, and Taunton.

Long Sutton, Compton Dundon and Ilchester around

Compton Dundon lies north of Somerton, with Butleigh and Keinton Mandeville to the north-east, Ilchester to the south-east, Long Sutton to the south-west and Huish Episcopi to the west.

About 17 miles east of Taunton, Somerset Council (unitary).

Get a free quote

Four checks on the ridge

A Somerton roof, from the market cross to the gutters

Four things to weigh up for a house in this old market town, each tied to the roof's materials and who has to agree.

Check 1 of 4

Listed streets and two churches

Count the listings before the slates

A town that has kept its old centre also keeps its paperwork. The National Heritage List holds 117 entries within 900 metres of Somerton's centre, among them Craigmore House and Crane Farmhouse at Grade II*. St Michael and All Angels church is Grade I, and Somerton Methodist Church is Grade II, and both entries date from 17 April 1959. Somerton also has a conservation area, so the question for any roof here is who has to agree before the work starts. Asking it early keeps the job moving.

Which approval does a church roof need?

The answer turns on the faith that owns the building and on whether it is open for worship today. Anglican churches in use follow the faculty system. Methodist churches in use follow a procedure run by the Methodist Church itself. Closed churches, Quaker and Unitarian meeting houses, and former chapels now used as homes go to Somerset Council for listed building consent. We never assume which category a building falls into, because its use can change. The people who look after it can tell us, and we work to what they confirm.

What about an ordinary house in the town?

A listed house can have a repair in matching material without much fuss, yet any alteration that touches its character needs listed building consent. A house that sits only in the conservation area keeps the like-for-like route, and the awkward jobs are a switch of covering, a changed ridge line or a skylight in the front slope. Our page on planning permission for roof work covers the general rules.

We photograph every slope and note its covering, which gives any consent application a factual description in place of a recollection. Owners keep those photographs, and they are useful later for a sale, a survey or an insurer's questions.

Look for

  • Slates in a mismatched shade
  • Ridge capping of a new profile
  • Roof windows facing the street
  • Cement used on old stone
Check 2 of 4

Where lias walls meet the roof

Stone gable edge meeting roof
The edges are where water gets in
Cracked and missing mortar along the verge of a concrete tile gable
Cracked and missing mortar along the verge of a concrete tile gable

The 1974 Victoria County History noted that no wholesale redevelopment had taken place in Somerton's centre and that continued use of lias and Ham stone had kept the older town in unity and scale. For a roofer that means a lot of stone walls running up to roof edges, and every one of those meetings is a place to check. Two terms help here. A verge is the sloped edge where a roof stops at a gable wall, and an abutment is the line where a pitched section finishes against a taller masonry wall. We look along every gable edge from a ladder or tower, because from the road a failing verge looks much like a sound one.

What decides the price

  • How much stone needs repointing
  • Lead flashing renewed or refixed
  • Whether the verge style changes

Why does water come in at a gable edge?

Because the joint between a stone wall and a roof covering has to cope with movement the stone does not share. Mortar pointing cracks, the bedding under the verge loosens, and rain runs in behind. Lead flashing or soakers, the small folded sheets that sit under each course at an abutment, are what keep the joint closed. Lead flashing can last for over 80 years, so a leak at an old abutment usually means the fixings or the pointing have failed before the metal has.

Should a verge be bedded in mortar or fixed dry?

A mortar-bedded verge is still fine to repair like for like. A dry verge uses mechanical clips and trims tested to BS 8612, and it does not rely on mortar alone. Marley notes that BS 5534 no longer lets mortar strength alone secure ridge and hip tiles, and a dry verge takes mortar out of the edge detail altogether. On a listed building the look of the verge may need consent, so we ask first. Our dry ridge and verge page explains how the systems work.

Sound or needs work

  • Sound: flashing tight into stone joint
  • Needs work: lifted lead and open pointing
Check 3 of 4

Low pitches and flat sections

Shallow slopes limit the covering

Somerton's parish church has a nave roof from about 1510 whose low-pitched slopes are divided into small panels, which tells you that shallow roofs have long been part of the town. A shallow slope matters because every covering has a lowest pitch it will keep water out at. For natural slate, BS 5534 indicates a minimum pitch of 20 degrees, and Cupa recommends against slate hooks on any slope under 25 degrees. A pitch that looks fine from the pavement can sit a few degrees under the line once it is measured on the slope. So a slate roof that has been re-pitched, or an extension laid too shallow, may need a different covering or a different fixing.

A roof only keeps water out if the covering suits the slope it sits on.

From the ground

  • Puddles that outlast the rain
  • Slates sliding on a shallow slope
  • Stains below a flat roof edge
  • Overflow at one gutter joint

Leave to a roofer

  • Taking the true pitch
  • Inspecting fixings under slates
  • Freeing a choked outlet
  • Pressing the deck for soft areas

What can go on a low-pitched slope?

Pitch is measured at the survey and set against the manufacturer's data sheet for the covering you have in mind, since minimums differ between products. If the slope is too shallow for slate, a tile made for low pitches or a membrane may be the sound answer, and you hear that before any price is written. Pushing a covering below its limit is how a roof ends up leaking within a few winters. A neighbour's roof at a steeper angle tells you little about yours, so we measure your own slope each time.

Why is water standing on my flat roof?

BS 6229:2025 keeps a minimum finished fall of 1:80 on a flat roof, and IKO advises designing for 1:40 so the finished roof still sheds water. If water is still there the day after rain, suspect a lost fall, a clogged outlet or a deck that has sagged. EPDM, which is synthetic rubber laid in one piece, is given a service life of 20 to 30 years by GreenSpec and 30 to 50 years by Less, so the sources disagree. GRP, glass-reinforced plastic laid as liquid resin over matting, is put at 25 to 40 years by Less. Our flat roofing page compares them.

Check 4 of 4

Somerset scaffold rules and one total

Notice, licence and a single figure
Detached brick garage and houses with tiled roofs on a residential street
Detached brick garage and houses with tiled roofs on a residential street

Section 169 of the Highways Act 1980 makes a Somerton pavement off limits to scaffold until the highway authority has issued a licence. In this area that means Somerset Council, whose permits are issued to accredited firms: whoever is appointed to the job files the application, never the householder. The charge is £124.60 for every 28-day period (April 2026), and at least 10 working days must pass before the first pole goes up. The date we offer already includes that wait, which keeps a stripped roof from sitting open while paperwork is processed. Small repairs may need only a tower or ladder, and scaffold inside your own plot stays off the highway.

Does a re-roof involve building control?

It can. On the Planning Portal's test, a job that affects under 25 per cent of the building envelope and under 50 per cent of the roof can usually go ahead without an application. A covering 15 per cent or more heavier is different, because it needs Building Regulations approval, with structural advice first. Somerset Building Control, on 0300 303 7790, covers the former district areas, and a call before a full re-roof settles the question for your address.

What decides the final figure?

The pitch of the roof, how hard it is to reach, the covering you choose and whatever the survey finds beneath it all move the figure. First you look at photographs of your own roof. The single written price comes after that, and all the waste leaves with us when we finish. Give us your Somerton address and the symptom that worries you, and the survey is booked.

What decides the price

  • Pavement scaffold or boundary access
  • Days the roof stays open
  • Amount of old timber renewed
  • Extra weight from a heavier covering

Walked the roof?

  1. 1 read
  2. 2 not read yet
  3. 3 not read yet
  4. 4 not read yet

When you have read the checks, we walk the roof and show you the photos.

Get a free quote

Somerton roofs, from lias walls to the nave

Which covering will work on a low-pitched Somerton roof?

The measured pitch and the product's data sheet decide it. Cupa reads BS 5534 as indicating a minimum of 20 degrees for natural slate, and it advises against slate hooks under 25 degrees. A shallower slope may suit a tile made for low pitches, or a membrane. We measure first, then tell you what the roof can take.

Who approves roof repairs to Somerton Methodist Church?

Listed Grade II, the church follows a route set by its present use. Should it still hold services, the Methodist Church's own system applies rather than council listed building consent. If it has closed or become a house, listed building consent from Somerset Council is needed. Whoever looks after the building can confirm which applies, and we wait for that answer before planning any work.

Do I need Somerset Council's permission to re-slate a house in Somerton?

Re-covering a house in the same material is not normally a planning matter, but a listed house also needs listed building consent for anything that affects its character. Check with Somerset Council's planning team for your address. A new covering 15 per cent or more heavier brings Building Regulations into play, so we weigh both at the survey.

Is it worth re-covering the flat roof on a Somerton extension?

Often it is, if the deck is dry and sound. Re-covering costs less than rebuilding, and a new membrane laid to a proper fall can last for many years. If the deck is soft or the fall has gone, the better buy is to replace those parts too. The survey and photographs show which case you have.

Book a Somerton roof survey

Send the street and the symptom, and a Somerton survey goes in the diary with photos of what we find.

01823 297042

10-year workmanship guarantee, in writing.

Call Get a free quote